2008 SPEC MIX BRICKLAYER 500 Regional Schedule

Words: Al ArreguinThe SPEC MIX BRICKLAYER 500® Regional qualifying competitions will be held throughout the United States and Canada over the next few months.

Remaining SPEC MIX BRICKLAYER 500® Regionals include:

Regional: Oklahoma
Date: May 9, 2008
Licensee: Ash Grove Packaging
Location: Tulsa Technology Center — 3420 South Memorial Drive — Tulsa, OK 74147
Contact: Charlie Boyd (501) 350-1010
Time: 11:00 AM
SPEC MIX Manager: Nick Blohowiak (920) 737-3856

Regional: Texas
Date: May 16th, 2008
Licensee: TXI
Location: TXI Hurst Packaging Facility — 9201 Trinity Blvd. — Ft. Worth, TX 76118
Contact: Barb Schmidt (214) 502-4467
Time: 1:30 PM
SPEC MIX Manager: Nick Blohowiak (920) 737-3856

Regional: Ohio
Date: August 9th, 2008
Licensee: QUIKRETE Cincinnati
Location: QUIKRETE Cincinnati — 5425 Kilby Rd. — Harrison, OH 45030
Contact: Brian Tillett (513) 615-4986
Time: 11:00 AM
SPEC MIX Manager: Nick Blohowiak (920) 737-3856

Regional: Chicago
Date: August 15th, 2008
Licensee: Packaged Concrete Inc.
Location: Packaged Concrete Inc. — 1S950 South Lorang Rd. — Elburn, IL 60119
Contact: Brian Petty (630) 557-8252
Time: 1:00 PM
SPEC MIX Manager: Nick Blohowiak (920) 737-3856

Regional: Iowa / Central Illinois
Date: August 22nd, 2008
Licensee: Great River / TCM Iowa
Location: King’s Materials Inc. — 3800 S. 1st St. — Eldridge, IA 52748
Contact: Arlen Beck (563) 506-1152
Time: 11:00 AM
SPEC MIX Manager: Nick Blohowiak (920) 737-3856

Regional: Colorado
Date: September 6th, 2008
Licensee: QUIKRETE Denver
Location: Quikrete Denver — 2660 West 64th Ave. — Denver, CO 80221
Contact: Riley Allen 303-819-7459/Brian Harms 303-819-7458
Time: 11:00 AM
SPEC MIX Manager: Tom Peterson (612) 750-8653

Regional: Mid Atlantic
Date: September 13th, 2008
Licensee: QUIKRETE Baltimore
Location: QUIKRETE Baltimore — 5401 Kirby Road — Clinton, MD 20735
Contact: Ed Owens (804) 512-3846
Time: 11:00 AM
SPEC MIX Manager: Nick Blohowiak (920) 737-3856

Regional: Nebraska / South Dakota
Date: September 13th, 2008
Licensee: TCC Materials Omaha
Location: TCC Materials Omaha — 3208 Keystone Dr. - Omaha, NE 68134
Contact: Lee Peacock 800-731-0350
Time: 11:00 AM
SPEC MIX Manager: Tom Peterson (612) 750-8653

Regional: Minnesota / North Dakota
Date: September 20th, 2008
Licensee: TCC Minnesota
Location: TCC St. Paul — 1351 Trout Brook Circle - St. Paul, MN 55117
Contact: Brian Digrado — 800-642-3887
Time: 11:00 AM
SPEC MIX Manager: Tom Peterson (612) 750-8653

Regional: Wisconsin, UP Michigan
Date: September 26th, 2008
Licensee: QUIKRETE Wisconsin
Location: QUIKRETE Wisconsin — W225 N6236 Village Drive — Sussex, WI 53089
Contact: Roy Greenwood (262) 246-4501
Time: 1:00 PM
SPEC MIX Manager: Nick Blohowiak (920) 737-3856

Regional: Northern California
Date: September 27th, 2008
Licensee: QUIKRETE Sacramento
Location: QUIKRETE Sacramento — 7705 Wilbur Way - Sacramento, CA 95828
Contact: Rob Dyer — 916-919-0463
Time: 11:00 AM
SPEC MIX Manager: Tom Peterson (612) 750-8653

Regional: Utah
Date: October 3rd, 2008
Licensee: Ash Grove Packaging Salt Lake City
Location: Ash Grove Packaging Salt Lake City — 15567 Minuteman Dr. — Draper, UT 84020
Contact: Rick Shorter — 800-457-3624
Time: 11:00 AM
SPEC MIX Manager: Tom Peterson (612) 750-8653

Regional: North & South Carolina
Date: October 3rd, 2008
Licensee: QUIKRETE North Carolina
Location: QUIKRETE North Carolina — 1130 Rollingwood Dr. — Claremont, NC 28610
Contact: Jason Stutts (704) 287-8551
Time: 1:00 PM
SPEC MIX Manager: Nick Blohowiak (920) 737-3856

Regional: Calgary, Alberta
Date: TBD
Licensee: QUIKRETE Western Canada
Location: Calgary, Alberta
Contact: Tom Bartley (403) 651-0650
Time: TBD
SPEC MIX Manager: Tom Peterson (612) 750-8653

Visit www.specmixbricklayer500.com for more information.
Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic

Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together

Zero Laydown: Navigating the Logistics of Tight Urban Job Sites
August 2026

In modern commercial construction, spatial real estate has become just as valuable as the materials themselves. The industry shift toward high-density, urban projects means that the sprawling job sites of the past have been replaced by tight footprints wh