When the Block Stops, the Money Stops

Words: John Smith Jr.https://masoncontractors.azurewebsites.net/Public/News/20110616060000-1.jpg" width="600" height="338" border="0" alt="Non-Stop’s new WORKHORSE is a light-weight elevating scaffolding for interior partitions and 1-story veneer up to 20 feet high." />
Non-Stop’s new WORKHORSE is a light-weight elevating scaffolding for interior partitions and 1-story veneer up to 20 feet high.
“When the block stops, the money stops.” Thatʼs the way one mason contractor put it, and he hit the nail right on the head. On the flip side, if your men work faster than you estimated, you spend less money on labor (and still get paid the bid price), and the leftover labor money is yours to keep. Just a little extra production returns a whole lot of extra profit. Only about one in 20 mason contractors really understands how much profit, and understanding it explains how a person can keep taking jobs below his competitor’s cost and stay in business.

While elevating scaffolding offers a significant advance when compared to frame scaffolding by eliminating most of the OSHA headaches, reducing back strain, etc., those may not be the most important benefits in these difficult times. How to beat the competition and make a profit are the important factors.

You see, for so many years, elevating scaffolding has been seen as a fancy way to scaffold a wall, but the positive impact it has on your job cost is real and quite significant. Here is the bottom line, and the answer to the question above: If you ask 20 mason contractors what a 20 percent increase in production does to your profit, 19 of them will say it increases profit by 20 percent, but that is wrong. In most masonry bids, the labor number is five times larger than the profit number. If labor is $100,000, profit might be around $20,000.

Reducing labor by 20 percent, just one-fifth, actually doubles profit. Thatʼs how your competitor can bid at your cost and still make money. All he has to do is work one-fifth faster than you. In lean times, you want to be the guy putting in materials at a rate that is faster than anyone else, and elevating scaffolding lets your men produce at a rate that is a minimum of one-fifth faster without even realizing it.

Over the years, hundreds of mason contractors have adopted elevating scaffolding. The concept of putting a crew in one place, and never moving them until the wall is topped out, increases their efficiency and production as much as 47 percent. It also simplifies the laborer’s work, since there is no more scaffold building and teardown. Laborers can spend 100 percent of their time tending the masons. They typically raise the scaffold for three minutes and tend the masons for 18 minutes. They raise the scaffold every 16 inches to keep the masons at the perfect working height.

Elevating scaffolding also has brought labor savings to the scaffold-erection and dismantling side of the equation. It is built once, and then moved from wall to wall with a forklift. Moving elevating scaffolding is, typically, four times faster than frames (at one-quarter of the cost). An experienced crew can move 100 feet to the next wall in about 1.5 hours. It also requires about one-third as many planks as frames.

Elevated Scaffolding Versus the Mast Climber

Contractors who use mast climbers typically own elevating scaffolding, too. It costs about four times less than mast climbers. When deciding which one to use, Monty Skinner of Skinner Masonry in Dallas described it this way, “On our 40-foot-and-under work, especially if there are ins and outs, weʼll use our Non-Stop. On 40-foot-and-over long, straight walls, weʼll tend to use our mast climbers, but only if there are multiple moves to make it worth the initial setup.”

Does it make sense to buy elevating scaffolding in this economy? Only if it will pay its own way — meaning, returning more money in labor savings than is going out to pay for the scaffolding. An easy way to find out is to simply figure what it costs you to pay a mason for a month. That varies from $3,800 a month to $8,600 a month, depending on where you live. A rule of thumb is that 105 feet of elevating scaffolding will replace two bricklayers, and it may cost around $28,000 to buy it. Therefore, if you have four months of work ahead, the scaffold can save you $7,600 a month and pay for itself. Go ahead and buy it.
About: Featured
2024 Architectural Awards: Excellence In Masonry Winners

The Masonry Advisory Council held the 2024 Excellence in Masonry Awards on Saturday, October 26th at 167 Green St., Chicago, Illinois. Honoring 80 projects from over the Chicagoland and Northwest Indiana Area. The Awards program celebrates outstanding ar

NSI and ISFA Announce Silica Exposure Literature Review

NSI and ISFA are proud to present a literature review that summarizes the growing library of studies related to respirable crystalline silica (RCS) exposure. Completed by Yale Occupational and Environmental Medicine, the study covers 34 publications and d

La Maison Franchère: How Masonry Turns Functional Buildings Into Timeless Beauty

La Maison Franchère, or the Franchers’ House, stands as a notable relic of stone architecture in Saint-Mathies, a small Quebec town on the edge of the Richelieu River. Unlike the neighboring homes, this towering, two-and-a-half-story mansion immediately c

MASONRY STRONG Podcast Episode 5 Recap: Zach Everett

Welcome back to another insightful episode of the Masonry Strong podcast! Today, we have a very special guest, Zach Everett, sharing his journey and experiences in the world of safety within the masonry industry. From humble beginnings to becoming a vital

About: Featured