Report From the Expo to Rebuild Chile

Words: Al ArreguinKOR-IT spent all last week in Santiago Chile participating in the Expo to Rebuild Chile. As you may remember, Chile suffered a massive 9.0 earthquake, numerous aftershocks, and a resulting tsunami which rivaling even the largest of quakes in USA. The Chilean infrastructure was devastated, hundreds of people perished, and the Government of Chile put the call out to the World to send experts who can assist with the rebuilding effort.

What we found was a country, which has an advanced infrastructure in place, however in certain regions, it was simply over-powered by nature. Currently the newly elected Chilean Government is focused on providing permanent housing solutions for those who were affected, and in the near future, will be considering cutting-edge proposals for rebuilding major public infrastructure torn apart from these events.

After the KOR-IT presentation on Wednesday, we spoke with numerous Government officials and local industry professionals who will be using KOR-IT core drill products for destructive testing of concrete on highways, roads and bridges throughout Chile. Additionally, we spent some time surveying the market for other uses of core drilling technology, including sign and fencing installations, manhole raising, precast concrete drilling, and more. Present at the tradeshow were search and rescue personnel who were impressed with our K-525-G25V Search and Rescue Concrete Drill and will be stocking them throughout Chile to ensure rapid rescue of survivors if this ever happens again.

We appreciated the chance to contribute to this event and hope we can help make a positive difference in the lives of the Chilean Citizens.
About: Tools
Beyond the Block: Aesthetic Innovations in CMU Construction
August 2026

Concrete masonry units (CMUs) have long been a mainstay of construction. They are well known as a “tried and true” material with a long history of high-strength structural performance, affordability, ease of assembly, and a long lifecycle. CMU constructio

The Most Overlooked Profit Center on Your Job Site
August 2026

The real cost of equipment ownership isn't what you pay on day one. It's what happens over the years that follow. The purchase price of a new mortar mixer, grout pump, material handling system, or masonry saw is only part of the investment. What happens

Installation Starts Before the First Course
August 2026

Some of the most expensive masonry installation problems begin long before crews arrive onsite. By the time a project reaches the field, many coordination decisions have already been made. Dimensional conflicts, congested reinforcement, specialty materia

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic