Eldorado Stone Expands With New Manufacturing and Distribution Facility

Words: Anonymous Anonymous

10 October 2017 — Eldorado Stone has opened a new 432,000-sq.-ft. manufacturing and distribution facility in Greencastle, Pa. It consolidates operations from a manufacturing plant near Greencastle and a distribution facility in Hagerstown, Md.

Eldorado Stone multi-family housing
Eldorado Stone, which produces architectural stone and brick veneer, has opened a new 432,000-sq. ft. manufacturing and distribution facility in Greencastle, Pa.

Eldorado Stone will be moving from a 90,000-sq.-ft. building to another nearly five times bigger in Antrim Commons Business Park .

“By consolidating operations into a single facility and upgrading equipment, our team will be able to increase capacity by 25 to 30 percent, while ultimately spending less on operational logistics,” said Ramsay Hawfield, VP of marketing & product development. “This increase will translate directly into enhanced service opportunities for Eldorado Stone customers all along the East Coast.”

“I’m a firm believer that if you provide people the environment that they can flourish in, they will,” said Frank Guthrie, Eldorado plant manager. “This building will give us the opportunity with better lighting, better air flow, safe work environment, better ergonomics. It will really allow us to take those next steps in our journey to world class.”

The building has a better training room, break room and bathrooms, Guthrie said. Robotics will improve ergonomics for employees.

Once the operations are stable at the new location, Eldorado will address hiring, Guthrie said. The company will be adding a fourth production line.

Incentives played a role in the project. Eldorado qualified for a $250,000 Pennsylvania First Program grant, $114,000 in Job Creation Tax Credits and a $400,000 low-interest PIDA loan. The company is leasing the 432,000-square-foot facility on 25.4 acres from the joint venture group of Atapco Properties and Chesapeake Real Estate Group LLC. Eldorado is investing $7 million in equipment and interior of the building.

Based in San Marcos, Calif., Eldorado Stone produces architectural stone and brick veneer, fireplace surrounds, fire bowls, and outdoor living products.

Source: http://www.democratandchronicle.com/story/news/2017/09/27/local-manufacturers-expand-promise-100-jobs/705798001/

Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together

PPE That Workers Actually Wear: Building Buy-In Through Education and Smart Selection
August 2026

In masonry construction, personal protective equipment (PPE) is often the last line of defense between a worker and an injury. Yet despite its importance, PPE compliance remains one of the most common challenges on jobsites across the country. The realit

Zero Laydown: Navigating the Logistics of Tight Urban Job Sites
August 2026

In modern commercial construction, spatial real estate has become just as valuable as the materials themselves. The industry shift toward high-density, urban projects means that the sprawling job sites of the past have been replaced by tight footprints wh