From the Editor: Acronyms: What PM Means to Me

Words: Dan Kamys

Editor Karen HickeyKaren Hickey, editor

To make comments or suggestions, send e-mail to karen@lionhrtpub.com.

Acronyms are ever-present in our daily lives. Readers of this magazine will be familiar with OSHA, EPA, and associations like ABAA, USGBC and AIA, to name only a few. Having just taken the helm as editor of Masonry Design and this being my first issue, I am thankful I already know what CMU, BIM-M and AEC mean. This got me thinking about the letters PM. While this abbreviation usually means post meridiem — the afternoon and evening of each day — it could also stand for project management or preventive maintenance. Let’s explore these two meanings.

As an editor, I’m essentially a project manager. My sales reps and I take blank pages and gather interesting editorial content and advertisements in each issue of the magazine. I’ve always said that putting a magazine together is like building a puzzle: eventually the pieces all come together. Likewise, with construction projects, all the pieces come together in time. A good project manager sees to it, though I know it’s much more involved than a jigsaw puzzle.

What about preventive maintenance? One might say that preventive maintenance is an essential element of project management, in the sense that if you’re managing the project correctly, you’ll avoid a lot of problems. Good project management would therefore naturally end up being preventive maintenance.

These days, technology plays an extensive role in both project management and preventive maintenance for the AEC environment. This issue of Masonry Design explores some of that technology, including BIM and various software programs that can help prevent problems and finish the project.

At the end of April I attended the AIA Conference in Orlando. There I saw firsthand the excitement surrounding BIM, virtual reality and other technologies for the built world. If you have a masonry building in which technology has played a role in the design/build process, tell me about it at karen@lionhrtpub.com. I’d love to cover more of this technology and these projects in the coming issues.

Empower Your Team to Help Prevent Cyberattacks
August 2025

Human error contributes to 82% of data breaches, making your employees a crucial line of defense against cyber threats.1 A single mistake could expose your business to a data breach. This could lead to data loss, downtime, and a negative impact on your bo

The True Costs of Traditional Wood Bucks: Beyond the Lumber Bill
August 2025

Wood bucks have been holding up CMU block on masonry jobs for decades now, albeit precariously. This infamous lumber has been sawed, screwed, braced, and cursed more often than anyone would want to count. For something meant to be temporary, they have cle

Remembering Kevin O'Shea
August 2025

It is with profound sadness that we announce the passing of Kevin O'Shea, a treasured figure in the industry, who passed on August 13th, at the age of 64. Kevin was not only the Safety Director at Hydro Mobile but also the Chair of the Safety Committee fo

MASONRY STRONG Podcast, Episode 27 Recap: Chris Bettinger, Oldcastle Coastal
August 2025

Chris Bettinger's journey into masonry wasn't a deliberate choice but rather a confluence of unexpected life events and career shifts. With an architecture degree from the University of Michigan, Chris began his career in residential design. However, the