Belgard® Hardscapes Introduces Mega-Tandem™ Wall Block

Words: Bronzella Cleveland

Belgard® Hardscapes has introduced the Mega-Tandem™ Mass Retaining Wall™ (MRW) block, a versatile wall block system with the natural look of stone that allows for building reinforced walls up to 15 feet high and gravity walls up to 10 feet without reinforcing.

"The size and connectors in the Mega-Tandem MRW system allow for a gravity wall height of up to 10 feet without a surcharge, which is ideal for  wall projects where it is difficult to impossible to excavate for stabilization for a retaining walls," said Al Pfannenstein, national retaining wall manager for Belgard Hardscapes. "This height is a sharp contrast to the traditional three-foot height that SRW products typically can achieve without reinforcement."

Mega-Tandem features a patent-pending, positive mechanical connection. The reinforced polypropylene connecting members create structural integrity in curved or straight retaining and freestanding walls. Available in a 12 x 24 panel weighing 65 pounds, the system has a running bond configuration so no patterns are required.

Meeting ASTM standards (C-1372 and C-1262), Mega-Tandem's 8,500 psi compressive strength concrete makes it suitable across the country, even the coldest environments where it can withstand harsh freeze-thaw cycles. It is available in three color blends, and in 12 different facial textures with the classic look of natural chiseled stone.

"The design versatility offered by Mega-Tandem provides flexibility for better integration of retaining walls in building and landscape designs of commercial properties and homeowners' outdoor living spaces," Pfannenstein said.

For more information and a how-to video, visit: http://youtu.be/WD5fxpFVMnI.

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic

Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together

Zero Laydown: Navigating the Logistics of Tight Urban Job Sites
August 2026

In modern commercial construction, spatial real estate has become just as valuable as the materials themselves. The industry shift toward high-density, urban projects means that the sprawling job sites of the past have been replaced by tight footprints wh