Belgard® Hardscapes Introduces Mega-Tandem™ Wall Block

Words: Bronzella Cleveland

Belgard® Hardscapes has introduced the Mega-Tandem™ Mass Retaining Wall™ (MRW) block, a versatile wall block system with the natural look of stone that allows for building reinforced walls up to 15 feet high and gravity walls up to 10 feet without reinforcing.

"The size and connectors in the Mega-Tandem MRW system allow for a gravity wall height of up to 10 feet without a surcharge, which is ideal for  wall projects where it is difficult to impossible to excavate for stabilization for a retaining walls," said Al Pfannenstein, national retaining wall manager for Belgard Hardscapes. "This height is a sharp contrast to the traditional three-foot height that SRW products typically can achieve without reinforcement."

Mega-Tandem features a patent-pending, positive mechanical connection. The reinforced polypropylene connecting members create structural integrity in curved or straight retaining and freestanding walls. Available in a 12 x 24 panel weighing 65 pounds, the system has a running bond configuration so no patterns are required.

Meeting ASTM standards (C-1372 and C-1262), Mega-Tandem's 8,500 psi compressive strength concrete makes it suitable across the country, even the coldest environments where it can withstand harsh freeze-thaw cycles. It is available in three color blends, and in 12 different facial textures with the classic look of natural chiseled stone.

"The design versatility offered by Mega-Tandem provides flexibility for better integration of retaining walls in building and landscape designs of commercial properties and homeowners' outdoor living spaces," Pfannenstein said.

For more information and a how-to video, visit: http://youtu.be/WD5fxpFVMnI.

Five Truths About Final Brick Cleandown
May 2026

Not all truths are self-evident. Sometimes they’re easy to forget or clouded with misunderstanding. The good news is these truths of final cleandown are not hard to implement on your next project to ensure successfully cleaned and beautiful new brick.

Shelf Angles and Their Impact on Wall Performance
May 2026

Shelf angles have long been a standard component in masonry construction. Installed at the slab edge, they provide support for brick veneer and are often treated as a routine detail. However, as building performance requirements evolve, particularly aroun

The Mason’s Mark: Defining the Craft Through the Trowel
May 2026

Walk onto any job site, from a custom residential chimney to a sprawling commercial block wall, and you will hear it before you see it: the distinctive ring of high-carbon steel striking masonry. The trowel is more than just a mortar scoop; it is the cond

Registration Now Open for the 2026 MCAA Midyear Meeting in San Antonio, Texas
May 2026

The Mason Contractors Association of America (MCAA) is thrilled to announce that registration is now open for the highly anticipated 2026 MCAA Midyear Meeting, set to take place in San Antonio, Texas. This exciting event is scheduled from September 13th-1