Young Centre

Words: Bronzella Cleveland

A symbol of Toronto’s thriving architectural and artistic scene

Young Centre for the Performing Arts, Toronto

The architecture scene in Toronto is growing and thriving. The metropolitan landscape there has become more than the CN Tower, which is prominent in the city’s skyline. But a building doesn’t have to be tall to be beautiful, distinctive and worthy of a tourism board’s postcards. For example, the Young Centre for the Performing Arts in the city’s rejuvenated Distillery District is as beautiful a theatre as you likely are to find anywhere in North America.

Project Team:
KPMB Architects

Read Jones Christoffersen Ltd. (structural)

Crossey Engineering Ltd. (mechanical, electrical)

Theatre Projects Consultants (theatre)

Aercoustics Engineering Ltd. (acoustics)

ERA Architects Inc. (heritage consultants)

The Beggarstaff Sisters (signage)

Dalton Engineering (contractor)

PHA Project Management Inc.

Project Cost:
$14 million

Construction Cost:
$10 million

Awards:
2007 United States Institute of Theatre Technology Architecture Honor Award

2007 Ontario Association of Architects Award of Excellence

2007 Business Week/Architectural Record Award

2007 Wood Design Award

2006 Canadian Interiors Best of Canada Project Winner

Project Team:
KPMB Architects

Read Jones Christoffersen Ltd. (structural)

Crossey Engineering Ltd. (mechanical, electrical)

Theatre Projects Consultants (theatre)

Aercoustics Engineering Ltd. (acoustics)

ERA Architects Inc. (heritage consultants)

The Beggarstaff Sisters (signage)

Dalton Engineering (contractor)

PHA Project Management Inc.

Project Cost:
$14 million

Construction Cost:
$10 million

Awards:
2007 United States Institute of Theatre Technology Architecture Honor Award

2007 Ontario Association of Architects Award of Excellence

2007 Business Week/Architectural Record Award

2007 Wood Design Award

2006 Canadian Interiors Best of Canada Project Winner

Project Team:
KPMB Architects

Read Jones Christoffersen Ltd. (structural)

Crossey Engineering Ltd. (mechanical, electrical)

Theatre Projects Consultants (theatre)

Aercoustics Engineering Ltd. (acoustics)

ERA Architects Inc. (heritage consultants)

The Beggarstaff Sisters (signage)

Dalton Engineering (contractor)

PHA Project Management Inc.

Project Cost:
$14 million

Construction Cost:
$10 million

Awards:
2007 United States Institute of Theatre Technology Architecture Honor Award

2007 Ontario Association of Architects Award of Excellence

2007 Business Week/Architectural Record Award

2007 Wood Design Award

2006 Canadian Interiors Best of Canada Project Winner

Designed by Toronto’s Kuwabara Payne McKenna Blumberg Architects (KPMB), the 44,000-square-foot facility consists of two renovated, 19th century tank houses. To respect the historic fabric of the site, KPMB says the overall design is characterized by a raw, warm, industrial aesthetic. For example, the building’s brick facades are exposed, the original windows remain, and the existing cobblestone pavers outside were conserved. Interior finishes, the firm explains, are utilitarian, limited to concrete floors and painted walls. Additionally, the ceilings are left exposed, KPMB says, to meet both cost and functional requirements, “but effectively achieve a complex visual canopy that weaves throughout the scheme.”

The theatre opened in January 2006, and is a shared facility between George Brown College and the Soulpepper Theatre Company. It consists of five, flexible theatres with seating ranging from 80 to 400; six, large rehearsal and teaching studios; three classrooms; a costume shop; administrative offices; a lobby and ticketing facilities; and a café and outdoor garden.

According to George Brown College, prior to the renovation, the tank houses were single-storey brick warehouse structures with existing floors at grade level. The new space links the two warehouses together with minimal structural intervention by spanning massive Douglas fir beams across bearing walls to create enclosed gathering spaces between the existing buildings. An extended, horizontal canopy defines the entrance.

Award winning masonry design – Young Centre for the Performing Arts

For obvious reasons, this spectacular facility is receiving a great deal of attention, including several design awards. Among its many accolades is the 2007 Business Week/Architectural Record Award. Architectural Record said the theatre’s contribution to the Distillery District’s new identity as an artistic center evidences good design’s ability to add vitality to an area. “The industrial palette of redbrick and dark timber reflects that of the surrounding community, which benefits from a raised public profile,” writes the magazine’s Christopher Kieran. “The influx of theatergoers increases revenues for local businesses and attracts new galleries, restaurants and shops.”

Save

Save

Contractor Tip of the Month: Taking Risks and Investing in People
June 2025

Great leaders don’t just manage risk, they challenge convention. While many chase margins and efficiencies, the most visionary among them invest in what matters most: their people. They see talent not as a cost, but as the foundation of innovation, loyalt

Fechino Files: Well, That is What He Told Me…
June 2025

As part of my job, I get the opportunity to have contractors, architects, and engineers discuss challenges that they face on the projects they are working on, and usually, they ask for advice. My job is easy; I am on the outside, basically without a dog i

GEN NXT: Arnold Barboan
June 2025

In an interview with the MCAA, Arnold Barboan shares his journey and insights into the masonry industry, highlighting the personal connections and passions that have helped shape his career. Arnold's initial involvement in masonry was inspired by family t

Business Building: Move Your Company To The Next Level!
June 2025

Is your construction business growing and giving you the results you wanted when you first started your entrepreneurial journey? Or are you stuck in the muck and can’t seem to get moving? As small companies begin to grow, they get bogged down, hit challen