2e Katendrechtse Haven

Words: Bronzella Cleveland

Not your average apartment complex

The 2e Katendrechtse Haven apartment building - a marvelously a-typical structure built with large-dimensioned red-brown brick.

Owner:
Bouwfonds 
Ontwikkeling Delft

Project Team:
DKV architekten
(architect)

Medo Metselbedrijf
(brickwork contractor)

Wienerberger [Wanlin]
(brick)

Cost:
$25 million 
(approx.)

Size:
Built surface area 
– 6,185 m2
Gross floor area 
– 22,360 m2

Materials:
According to DKV, the main material for the complex is large-dimensioned red-brown brick. Supplementary materials are wood for the square and the staggered vertical windows in the high-rise blocks, metal in the extended facade openings and the walkway on the square, and glass for the high-rise façades facing the water, where conservatories form a single large surface

Awards:

2006 Best International Project finalist in the annual competition from the Brick Development Association Initiative in London.

2004 Bouw Kwaliteits Prijs Rotterdam nomination.

Owner:
Bouwfonds 
Ontwikkeling Delft

Project Team:
DKV architekten
(architect)

Medo Metselbedrijf
(brickwork contractor)

Wienerberger [Wanlin]
(brick)

Cost:
$25 million 
(approx.)

Size:
Built surface area 
– 6,185 m2
Gross floor area 
– 22,360 m2

Materials:
According to DKV, the main material for the complex is large-dimensioned red-brown brick. Supplementary materials are wood for the square and the staggered vertical windows in the high-rise blocks, metal in the extended facade openings and the walkway on the square, and glass for the high-rise façades facing the water, where conservatories form a single large surface

Awards:

2006 Best International Project finalist in the annual competition from the Brick Development Association Initiative in London.

2004 Bouw Kwaliteits Prijs Rotterdam nomination.

Owner:
Bouwfonds 
Ontwikkeling Delft

Project Team:
DKV architekten
(architect)

Medo Metselbedrijf
(brickwork contractor)

Wienerberger [Wanlin]
(brick)

Cost:
$25 million 
(approx.)

Size:
Built surface area 
– 6,185 m2
Gross floor area 
– 22,360 m2

Materials:
According to DKV, the main material for the complex is large-dimensioned red-brown brick. Supplementary materials are wood for the square and the staggered vertical windows in the high-rise blocks, metal in the extended facade openings and the walkway on the square, and glass for the high-rise façades facing the water, where conservatories form a single large surface

Awards:

2006 Best International Project finalist in the annual competition from the Brick Development Association Initiative in London.

2004 Bouw Kwaliteits Prijs Rotterdam nomination.

Rising 21 stories above the Meuse River (or Maas River), in Rotterdam, The Netherlands, the 2e Katendrechtse Haven apartment building (part of a larger neighborhood of apartments and single-family homes) is a marvelously a-typical structure – at least from a Westerner’s perspective. The Dutch, however, continue to produce exotic and unique building designs that are reflective of the independent spirit of this proud nation of 16 million people. (See the van Gogh Museum, The Animal Refuge Centre, The Music Building, etc.) Whereas most residential high-rises – perhaps even some in The Netherlands – are your average glass, steel and concrete rectangles, this complex is built with large-dimensioned red-brown brick and features a prominent, 39-foot overhang for each trapeziform tower.

Designed by DKV architekten of Rotterdam, the 2e Katendrechtse Haven project was built between 1997 and 2003. According to DKV, the spectacular location on the river was the starting point of the architectural plan for the project.

The high-rise towers, which are oriented toward the sun and the course of the river, seem to float above the peripheral construction, offering a playful yet brilliantly designed homage to the way children tend to construct with their building bricks and other such toys. DKV says the high-rise blocks accommodate two or three apartments on each story, and a three-and-a-half story entrance hall in each tower faces the central square of the complex. These apartments have a fixed core and a flexible layout; two-floor apartments occupy the top of the stories of the buildings. All apartments are equipped with ‘exterior’ areas with windows that can be folded back along the entire width, offering a spectacular view out across the river.

According to DKV, the pallet of materials used in the entire complex was limited. The basic image-carrier of the complex, the firm says, is the red-brown brick, glued in order to reinforce the intensity of the color. Supplementary materials are wood for the square and the staggered vertical windows in the high-rises, metal in the extended facade openings and the walkway on the square, and glass for the high-rise façades facing the water, where conservatories form a single, large surface.

The architecture and the materials emphasize the uniformity of the urban ensemble, DKV reports.

Rising 21 stories above the Maas River in Rotterdam the 2e Katendrechtse Haven apartment building is a marvelously a-typical structure built with large-dimensioned red-brown brick.

Other aspects of the complex: A slightly elevated public square above a subterranean car park; and the most important street in the quarter has been extended, in the form of a monumental staircase, across the square and ending in a belvedere on the river.

It would seem that the 2e Katendrechtse Haven apartment buildings provide an idyllic setting in which to live. Residents are surrounded by nature and can, in fact, invite nature into their homes via the large glass façades. This is definitely not your average apartment building, but the Dutch probably wouldn’t have it any other way.

Save

Save

Save

High-Performance Masonry Units: Elevating Structural Integrity and Aesthetics
September 2025

Manufactured concrete masonry units have been present in the construction marketplace for over 120 years. They are ubiquitous and are made in virtually every country on earth. The development of high-performance masonry units currently available across th

Building Tomorrow, Digitally: How Tech is Revolutionizing Masonry
September 2025

The rhythmic tap of the trowel, the satisfying click of brick on mortar – masonry, in its essence, is a craft steeped in tradition. For centuries, it has shaped our skylines, built our homes, and stood as a testament to human ingenuity and skill. But just

MASONRY STRONG Podcast, Episode 28 Recap: Kendall Anderegg, President and CEO at Mutual Materials Company
September 2025

Kendall Anderg's journey in the masonry industry is a remarkable tale of legacy, innovation, and community impact. Hailing from the Pacific Northwest, Kendall's family business has been a staple in the industry since its founding in 1900. Now celebrating

Ensuring Safety in Scaffold Access and Transference
September 2025

One of the most relevant issues currently affecting the industry is scaffold plans and safety. You are probably aware of new scaffold regulations required by general contractors and owners. IT IS VITAL THAT YOU ARE AWARE OF THESE REQUIREMENTS WHEN BIDDING