Rafael Viñoly Complete New Wing of CMA

Words: Bronzella Cleveland

Fall 2009
Industry News

Rafael Viñoly Architects Complete
New East Wing of
Cleveland Museum of Art

Rafael Viñoly Architects Complete New East Wing of Cleveland Museum of Art
Photo courtesy of Brad Feinknopf

The new, 139,200-square-foot east wing of the Cleveland Museum of Art (CMA), designed by New York-based Rafael Viñoly Architects, has opened to the public. Its completion marks the opening of the first of three planned wings.

According to the firm, the new, stone-clad addition to the CMA unites the original, historic Beaux-Arts building (1916) and the Marcel Breuer addition (1971), creating a coherent sequence of galleries that accommodates projected growth and unifies disparate architectural vocabularies into a singular composition. The stone cladding of the new gallery consists of alternate bands of granite and marble that modulate the two very different aesthetics of the 1916 and Breuer buildings, Rafael Viñoly Architects says. In this manner, the distinctions between “modern” and “historic” are preserved, yet integrated into a cohesive whole.

The new east wing is part of a seven-year expansion and renovation project. Plans call for previous additions to the CMA to be demolished to make way for a vast, indoor, sunlit piazza, topped by a gently curving canopy of glass and steel, around which the entire museum will be organized. New gallery wings to the east and west will enclose the piazza and taper toward the original building, where they culminate in fully transparent, glazed galleries and pedestrian bridges that permit unobstructed views of the sides of the historic pavilion.

The entire project is scheduled to be completed in 2012. MD

The Importance of Eye Protection in Masonry
January 2026

There are few stereotypes more iconic than the image of a construction worker wearing a hard hat and safety glasses. Protective glasses are among the most common items worn by workers in the masonry field, second only to the hard hat. According to OSHA, w

2026 Skills Challenge and Fastest Trowel on the Block Winners
January 2026

Holding History Together: The Art of Lateral Restraint in Masonry Restoration
January 2026

The first thing you notice about an old masonry building isn’t always its beauty. Sometimes it’s the bow in a wall or the way time and the elements have tugged at the mortar joints. Every century-old structure carries its story in cracks, tilts, bows, and

Stone Savvy: Helping Clients Choose Stone with Intent
January 2026

In today’s design environment, clients are surrounded by inspiration, endless images, samples, and styles that make choosing materials feel exciting and overwhelming all at once. Within that sea of options, stone carries weight. It defines first impressio