New Step Offering From Michels Stone

Words: Bronzella Cleveland

New Step Offering From Michels Stone
www.michelsstone.us

As part of its ongoing commitment to sustainability, Michels Stone is pursuing innovative ways to develop products. When selecting and sorting material, the company works to utilize leftover stone that may not have fit perfectly into one of its established product categories. The team recently found a way to repurpose some smaller limestone blocks into beautiful, naturally shaped steps. Rather than converting this stone into an aggregate, Michels opted to saw the pieces into 6-inch-thick stair sections that can be installed quickly within any setting. The steps are rich with character and look as though Mother Nature set them in place millions of years ago. Available in chocolate or caramel color, the steps feature a bush hammered finish for added traction under foot. Contact one of Michels’ knowledgeable staff members for more information.

Ensuring Safety in Scaffold Access and Transference
September 2025

One of the most relevant issues currently affecting the industry is scaffold plans and safety. You are probably aware of new scaffold regulations required by general contractors and owners. IT IS VITAL THAT YOU ARE AWARE OF THESE REQUIREMENTS WHEN BIDDING

Thermal Mass in Masonry
September 2025

A building’s exterior design and material selection impact all aspects of the final product, from indoor air quality to overall energy efficiency. When design-build teams aim to achieve a more energy-efficient building, material selection is the most cruc

STABILA Introduces Innovative New Products for Fall Launch
September 2025

STABILA, a trusted name synonymous with precision, durability, and quality, is excited to announce the launch of several innovative products this fall. The lineup features the compact and versatile LAX320G laser level and the advanced LD530 Laser Distance

From Bikes to Buildings: Part 2
September 2025

As rainscreen wall designs become increasingly prevalent in today’s construction environment, there have been questions regarding their design. How wide should the capillary break be? How do we create this capillary break? Can the same methods be used i